Commercial solar assessments in NSW.

Roof assessment in about five seconds. Free — no email, no bill.

Finding the building outline…

Costco, 10, Langford Drive

Measuring the roof…
Know whether the opportunity deserves your time

What we do

Feasibility first, then one introduction.

Not a quote-comparison site, and your details are never sold on to a panel. Three steps, and you can stop at any of them.

Free first-pass feasibility

Roof capacity, indicative system size, generation and electricity value from the address alone — before anyone asks you for a bill.

We develop the project

Bill and network tariff decoded, daytime load checked, layout and payback modelled, constraints written down. You end up with a brief your team can act on.

One installer, not five

If it stacks up, we introduce you to the single installer we would use for that site and brief them properly. The installer pays us. You pay nothing.

The first decision

Know whether solar deserves your time.

A large roof does not automatically make a good project. The useful question is whether your roof, daytime demand and electricity costs line up.

You get an early view of the opportunity before committing staff time to gathering bills, comparing proposals or hosting a site visit.

Roof capacity

See the indicative roof area, system scale and visible constraints before requesting a design.

Energy fit

Understand why your daytime demand, operating hours and tariff matter to the result.

Information gaps

Know what still needs checking before anyone can give you a credible savings case.

Run a free roof check on your site
Aerial view of the ARA Metalbilt commercial solar installationView project

What you receive

A brief your team can actually use.

After one short call, you receive a concise first-pass view of the project — not a generic solar pitch. It gives your team the facts, assumptions and questions needed to decide what happens next.

Behind that brief are bespoke in-house design and modelling tools built to test roof layouts, generation, tariff fit and design assumptions quickly — so the expert call starts with evidence, not guesswork.

Site and call summary

Your priorities, operating hours, known constraints and the key facts in one clean record.

Indicative roof plan

A marked-up view of usable roof area, possible panel blocks, access paths and visible exclusions.

Commercial sense-check

How your usage, tariff, network limits and missing data may affect whether the project is worth pursuing.

Bespoke in-house modelling · Real tool footage
Solar installers working across a large commercial rooftop arrayView project

Your decision path

From a roof check to a developed project.

Four steps in this order, so nothing gets promised before it has been checked.

01

Roof check

Enter the address. Roof capacity, indicative system size, generation and electricity value come back in about a minute.

02

Bill and tariff review

On a short call we read the bill properly: network tariff, demand and power-factor charges, daytime load and any existing solar.

03

First-pass feasibility

You get the model — indicative layout, generation, tariff fit, payback and the constraints that still need checking on site.

04

One introduction

If the project stands up, we introduce you to one installer we would use for that site and hand over the brief. No panel, no bidding war.

Start with the free roof check

Before accepting a quote

Remove the expensive unknowns.

We recommend a focused site study before a quote is accepted. It tests the assumptions that a desktop model and standard site visit cannot safely settle.

The aim is to uncover connection costs, structural work and technical constraints before they become variations, delays or permanent performance limits.

Grid connection

Confirm the connection pathway, export limits and network requirements before projected savings are treated as reliable.

Reduces the risk of connection costs and unexpected curtailment.

Engineering assessment

Verify roof condition, structural capacity, wind loads and whether strengthening or remedial work may be required.

Reduces the risk of structural failure and late strengthening costs.

Technical review

Check the equipment, electrical design, access, protection and constructability against the real site.

Reduces the risk of redesigns, variations and avoidable delays.
Solar modules on the All Secure mixed-use facility in Three KingsView project

About Energy Projects

Commercial energy decisions, evidence first.

Energy Projects AU helps commercial and industrial sites decide whether solar stacks up before they commit to proposals, site visits or engineering spend. The work is an evidence-first first pass: roof capacity, usage fit, tariff context and the questions that still need answers.

The practice is led by Mike Anderson, with commercial solar experience from ZEN Energy NZ and Future Energy — five years of NSW commercial solar work behind the feasibility, and a working relationship with the installers who deliver it.

Check a roof before you call anyoneEnergy Projects Limited · Newcastle NSW 2304

Contact us

Request a site assessment.

Send through your site address and what you would like checked. We will review the details and come back with a clear early answer — not a sales pitch.

For a bill review, email your bill or a photo to the address below, or use the form to request a call.